Tuesday, April 14, 2020

Kitchen Remodel - Days 4 and 5

Kitchen Remodel Day 4
 Darren pulled some new electric wire on Day 4.
He also stripped off some of the old flooring.

Kitchen Remodel Day 5

Day Five was spent pulling more wire and replacing the sub-flooring. 
 He also showed me the layout for the island.  This room is going to drastically change looks.

No comments: